Price lists and terms of contract for district heating
If there is any conflict between the English and Finnish versions of the price lists, the Finnish version shall prevail.
If there is any conflict between the English and Finnish versions of the price lists, the Finnish version shall prevail.
The connection fee price list applies to new properties. Customers changing their heating method will receive an offer on a case-by-case basis.
The availability of district heating at the address must always be confirmed with Lahti Energy. The price list applies only to addresses where Lahti Energy has confirmed that district heating is available.
The price includes 15 metres of connection pipe outside the building and 2 metres inside the building. Any metres exceeding these lengths will be charged according to the price list.
The length of the connection pipe outside the building is calculated from the district heating network connection point to the entry point of the building. The length of the connection pipe inside the building is calculated from the entry point to the metering device.
The connection fee includes excavation work for the connection route, the connection pipe material and connection work from the district heating network up to the metering centre, the wall penetration component, backfilling of the excavation with the removed or equivalent soil material, and rough levelling of the excavation within the plot area. The connection fee does not include final finishing work within the plot area, structural penetration work or installation of the wall penetration component. Lahti Energy is responsible for finishing work in areas outside the plot.
Lahti Energy reserves the right to offer a district heating connection at a higher connection fee than would be calculated according to the price list if the construction costs of the connection include something out of the ordinary.
The price list applies to one district heating connection for a detached house, semi-detached house or similar residential building. The price list does not apply to buildings with more than two dwellings.
1 255 EUR (VAT 25,5%) is added to the normal connection fee, and the resulting amount is divided equally into two connection fees.
The connection fee is determined using the formula on the price list.
Connections with a contracted water flow more than 25 m3/h are priced on a case-by-case basis.
| Connection fee, € | 4 593,30 + additional metres |
| Additional metres, €/m | 188,25 |
| Connection fee |
| Connection fee, € | 3660 + additional metres |
| Additional metres, €/m | 150 |
| Contracted water flow, V | Connection fee, € |
|---|---|
| 0–0,5 | 6024 + additional metres |
| 0,6–1,5 | (4800 + (V – 0,5) x 2700) x 1,255 + additional metres |
| 1,6–9 | (7500 + (V – 1,5) x 400) x 1,255 + additional metres |
| 9,1–25 | (10500 + (V – 9) x 125) x 1,255 + additional metres |
| Connection fee |
| Contracted water flow, V | Connection fee, € |
|---|---|
| 0–0,5 | 4800 + additional metres |
| 0,6–1,5 | (4800 + (V – 0,5) x 2700) + additional metres |
| 1,6–9 | (7500 + (V – 1,5) x 400) + additional metres |
| 9,1–25 | (10500 + (V – 9) x 125) + additional metres |
| Contracted water flow, V | Additional metres outside, €/m | Additional metres inside, €/m |
|---|---|---|
| 0–0,5 | 225,90 | 188,25 |
| 0,6–1,5 | 276,10 | 188,25 |
| 1,6–9 | 301,20 | 238,45 |
| 9,1–25 | 338,85 | 282,38 |
| Connection fee |
| Contracted water flow, V | Additional metres outside, €/m | Additional metres inside, €/m |
|---|---|---|
| 0–0,5 | 180 | 150 |
| 0,6–1,5 | 220 | 150 |
| 1,6–9 | 240 | 190 |
| 9,1–25 | 270 | 225 |
See the price in the price list.
Request a quote from us.
For additional work agreed upon separately with the customer, the charge will be according to the quote provided or at an hourly rate as per the price list
| Inspection and expansion vessel maintenance | 109 € |
| Inspection and expansion vessel maintenance | 107,70 € |
| Inspection and expansion vessel maintenance | 86,85 € |
| Inspection and expansion vessel maintenance | 209 € |
| Inspection and expansion vessel maintenance | 206,50 € |
| Inspection and expansion vessel maintenance | 166,53 € |
| Inspection, 1 heat distribution centre | 189 € |
| Expansion vessel maintenance, 1 expansion vessel | 59 € |
| Inspection, 1 heat distribution centre | 186,74 € |
| Expansion vessel maintenance, 1 expansion vessel | 58,29 € |
| Inspection, 1 heat distribution centre | 150,60 € |
| Expansion vessel maintenance, 1 expansion vessel | 47,01 € |
| Additional work agreed upon separately | 65 €/hour |
| Additional work agreed upon separately | 68,18 €/hour |
| Additional work agreed upon separately | 54,98 €/hour |
Meter inspection in accordance with the terms of sale for district heating as per an external inspector’s offer.
MSCONS message service price list: *Includes e.g. power of attorney renewals, adding and terminating individual places of use and determining place of use numbers.
If your district heating payment is delayed, it will be transferred to our partner Ropo for processing. Ropo will charge service fees according to their price list. You will find contact information and details about the invoice on the bill sent by Ropo.
| Payment request and disconnection notice (VAT 0%) | 5 € |
| Reprinting an invoice | 5,06 € |
| Payment agreement fee | 10,12 € |
| Payment request and disconnection notice (VAT 0%) | 5 € |
| Reprinting an invoice | 5 € |
| Payment agreement fee | 10 € |
| Payment request and disconnection notice (VAT 0%) | 5 € |
| Reprinting an invoice | 4,03 € |
| Payment agreement fee | 8,06 € |
| Disconnection fee | 60,73 € |
| Connection on the same working day (order placed before 1 pm) | 60,73 € |
| Express connection (connection on the same day, order placed after 1 pm) | 121,45 € |
| Disconnection fee | 60 € |
| Connection on the same working day (order placed before 1 pm) | 60 € |
| Express connection (connection on the same day, order placed after 1 pm) | 120 € |
| Disconnection fee | 48,39 € |
| Connection on the same working day (order placed before 1 pm) | 48,39 € |
| Express connection (connection on the same day, order placed after 1 pm) | 96,77 € |
| The first inspection is free of charge. Subsequent inspections: | |
|---|---|
| Other than detached houses | 506,05 € |
| Detached houses | 101,21 € |
| The first inspection is free of charge. Subsequent inspections: | |
|---|---|
| Other than detached houses | 500 € |
| Detached houses | 100 € |
| The first inspection is free of charge. Subsequent inspections: | |
|---|---|
| Other than detached houses | 403,23 € |
| Detached houses | 80,65 € |
| Setting up delivery | 121,45 €/h (min 1 h) |
| Transmission of historical data | 121,45 €/h (min 1 h) |
| Place of use processing fee * | 121,45 €/h (min ½ h) |
| Termination of delivery | free of charge |
| Setting up delivery | 120 €/h (min 1 h) |
| Transmission of historical data | 120 €/h (min 1 h) |
| Place of use processing fee * | 120 €/h (min ½ h) |
| Termination of delivery | maksuton |
| Setting up delivery | 96,77 €/h (min 1 h) |
| Transmission of historical data | 96,77 €/h (min 1 h) |
| Place of use processing fee * | 96,77 €/h (min ½ h) |
| Termination of delivery | maksuton |
| 200 € |
| 159,36 € |
| 159,36 € |
| Installer’s hourly rate | 65 €/h |
| Overtime | 100 €/h |
| Sunday or holiday work | 135 €/h |
| Surveys | 60,73 €/h |
| Advisory visit to the customer during working hours | 80,97 €/h |
| Installer’s hourly rate | |
| Overtime | |
| Sunday or holiday work |
| Installer’s hourly rate | 51,79 €/h |
| Overtime | 79,68 €/h |
| Sunday or holiday work | 107,57 €/h |
| Surveys | 48,39 €/h |
| Advisory visit to the customer during working hours | 64,52 €/h |
District heating fees prices starting 1 January 2025 (consumers)
The district heating fees price list is the price list for consumer customers. The price list is selected based on the connection owner. The price list is not available for companies. However, this price list may also be selected by customers whose connection owner has a business ID, but the place of use has only one or two dwellings and no other space to be heated.
The total price of district heating consists of an energy fee, a fixed fee, a return water fee/compensation and taxes. The lowest possible laskutusteho for a detached house is 12 kW (9 kW in block heating).
Laskutusteho is billing power and laskutusvesivirta is billing water flow in English.
Fixed fee for district heating
The amount of the fixed fee depends on the laskutusteho (Ø) or laskutusvesivirta (V).
The fixed fee is determined according to the tariff as follows: Tariff 1 applies to sites with laskutusteho of up to 50 kW. Tariff 2 applies to sites with laskutusvesivirta of up to 4 m³/h. Sites larger than this are included in tariff 3.
As of 1 January 2025, the coefficient values are: k1= 3,95 k2= 4,45 k3= 4,45.
District heating return water fee/compensation as of 1 September 2020
The return water fee/compensation applies to places of use with laskutusvesivirta of 10 m3/h or more. The fee/compensation is a maximum of 5% of the sum of the fixed and energy fees for the billing period. The fee/compensation is invoiced only during the heating period (September–April). The target level of return water temperature is 43°C.
The return water fee/compensation, €/month (VAT 0%), is calculated as follows:
Tp = average return water temperature for the month, °C
E = energy consumption for the month, MWh
The value added tax valid at any given time is added to the return water fee/compensation.
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | 99,02 |
| 1 Apr–31 May | Spring period | 70,48 |
| 1 Jun–31 Aug | Summer period | 39,35 |
| 1 Sep–31 Oct | Autumn period | 70,48 |
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | |
| 1 Apr–31 May | Spring period | |
| 1 Jun–31 Aug | Summer period | |
| 1 Sep–31 Oct | Autumn period |
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | 78,90 |
| 1 Apr–31 May | Spring period | 56,16 |
| 1 Jun–31 Aug | Summer period | 31,36 |
| 1 Sep–31 Oct | Autumn period | 56,16 |
| Rate | Fixed fee €/year |
|---|---|
| 1 | k1 x 13,96 x (Ø) x 1,255 |
| 2 | k2 x (91,66 + 859,44 x V) x 1,255 |
| 3 | k3 x (2204,10 + 331,33 x V) x 1,255 |
| Rate | Base charge €/year |
|---|---|
1
| |
| 2 | |
| 3 |
| Rate | Base charge €/year |
|---|---|
1
| k1 x 13,96 x (Ø) |
| 2 | k2 x (91,66 + 859,44 x V) |
| 3 | k3 x (2204,10 + 331,33 x V) |
Teholämpö as of 1 January 2025 (companies, default price list)
Teholämpö is the default price list for places of use where the connection owner has a business ID. Teholämpö is not available for consumer customers. The price list can be changed every 12 months. The total price of district heating consists of an energy fee, a fixed fee and taxes.
Fixed fee
The fixed fee consists of two power fees: power fee 1 and power fee 2. The capacities for the power fees are determined based on hourly metering at the place of use. The district heating bill shows laskutusteho 1, which determines power fee 1, and laskutusteho 2, which determines power fee 2. Laskutusteho is billing power in English.
The review period is 1 April 2023–31 March 2025. If the heat consumption at the place of use has started later than 1 January 2024, both capacities correspond to the contracted capacity. (For new buildings, 60% of the contracted capacity.)
| Capacity at minimum, kW (Ø) | €/year |
|---|---|
| 0 | 685,13 x 1,255 |
| 20 | (-214,43 + 44,98 x Ø) x 1,255 |
| 50 | (308,57 + 34,52 x Ø) x 1,255 |
| 100 | (831,57 + 29,29 x Ø) x 1,255 |
| 300 | (6 009,27 + 12,03 x Ø) x 1,255 |
| Capacity at minimum, kW (Ø) | €/year |
|---|---|
| 0 | |
| 20 | |
| 50 | |
| 100 | |
| 300 |
| Capacity at minimum, kW (Ø) | €/year |
|---|---|
| 0 | 685,13 |
| 20 | -214,43 + 44,98 x Ø |
| 50 | 308,57 + 34,52 x Ø |
| 100 | 831,57 + 29,29 x Ø |
| 300 | 6 009,27 + 12,03 x Ø |
| Capacity at minimum, kW (Ø) | €/vuosi |
|---|---|
| 0 | 685,13 x 1,255 |
| 20 | (-214,43 + 44,98 x Ø) x 1,255 |
| 50 | (308,57 + 34,52 x Ø) x 1,255 |
| 100 | (831,57 + 29,29 x Ø) x 1,255 |
| 300 | (6 009,27 + 12,03 x Ø) x 1,255 |
| Capacity at minimum, kW (Ø) | €/vuosi |
|---|---|
| 0 | |
| 20 | |
| 50 | |
| 100 | |
| 300 |
| Capacity at minimum, kW (Ø) | €/year |
|---|---|
| 0 | 685,13 |
| 20 | -214,43 + 44,98 x Ø |
| 50 | 308,57 + 34,52 x Ø |
| 100 | 831,57 + 29,29 x Ø |
| 300 | 6 009,27 + 12,03 x Ø |
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | 98,73 |
| 1 Apr–31 May | Spring period | 70,27 |
| 1 Jun–31 Aug | Summer period | 39,24 |
| 1 Sep–31 Oct | Autumn period | 70,27 |
| Price period | €/MWh | |
|---|---|---|
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | 78,67 |
| 1 Apr–31 May | Spring period | 55,99 |
| 1 Jun–31 Aug | Summer period | 31,27 |
| 1.9.–31.10. | Autumn period | 55,99 |
Tasalämpö may be selected for places of use where the connection owner has a business ID. If the heat supply of the site is part of some other contract package, Tasalämpö cannot be selected for the place of use. The price list can be changed every 12 months.
The total price of district heating consists of an energy fee, a fixed fee and taxes.
Fixed fee
The fixed fee is power fee 1. The capacity for the power fee is determined based on hourly metering at the place of use. The district heating bill shows laskutusteho 1, which determines power fee 1. Laskutusteho is billing power in English.
The review period is 1 April 2023–31 March 2025. If the heat consumption at the place of use has started later than 1 January 2024, the capacity corresponds to the contracted capacity. (For new buildings, 60% of the contracted capacity.)
Inspection of district heating equipment is included in the price
Tasalämpö includes an inspection of the district heating equipment once every three years.
| Capacity at minimum, kW (Ø) | €/year |
|---|---|
| 0 | 3435,78 x 1,255 |
| 20 | (1 318,26 + 105,88 x Ø) x 1,255 |
| 50 | (1 473,96 + 102,76 x Ø) x 1,255 |
| 200 | (4 380,36 + 88,23 x Ø) x 1,255 |
| 300 | (10 608,36 + 67,47 x Ø) x 1,255 |
| Capacity at minimum, kW (Ø) | €/year |
|---|---|
| 0 | |
| 20 | |
| 50 | |
| 200 | |
| 300 |
| Capacity at minimum, kW (Ø) | €/vuosi |
|---|---|
| 0 | 3 435,78 |
| 20 | 1 318,26 + 105,88 x Ø |
| 50 | 1 473,96 + 102,76 x Ø |
| 200 | 4 380,36 + 88,23 x Ø |
| 300 | 10 608,36 + 67,47 x Ø |
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | 76,02 |
| 1 Apr–31 May | Spring period | 54,10 |
| 1 Jun–31 Aug | Summer period | 30,21 |
| 1 Sep–31 Oct | Autumn period | 54,10 |
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | |
| 1 Apr–31 May | Spring period | |
| 1 Jun–31 Aug | Summer period | |
| 1 Sep–31 Oct | Autumn period |
| Price period | €/MWh | |
|---|---|---|
| 1 Nov–31 Mar | Winter period | 60,57 |
| 1 Apr–31 May | Spring period | 43,11 |
| 1 Jun–31 Aug | Summer period | 24,07 |
| 1 Sep–31 Oct | Autumn period | 43,11 |
Rakentajan Lämpö is a price list for new buildings. Rakentajan Lämpö is valid only during the construction of the new building. When the final inspection of district heating has been carried out at the site, Rakentajan Lämpö ends and a default price list is selected for the place of use based on the owner of the connection.
The total price of the Rakentajan lämpö consists of the energy fee and taxes. There is no fixed fee.
Rakentajan Lämpö is verified with guarantees of origin. District heating verified with guarantees of origin is produced with renewable energy sources.
| Rakentajan lämpö | 112,95 €/MWh |
| Rakentajan lämpö | 111,60 €/MWh |
| Rakentajan lämpö | 90,00 €/MWh |
We offer guarantees of origin as an additional service for district heating. District heating verified with guarantees of origin is produced with renewable energy sources.
| 1,00 € / MWh |
| 0,99 €/MWh |
| 0,80 €/MWh |
The connection fee price list applies to new properties. Customers changing their heating method will receive an offer on a case-by-case basis.
The availability of district heating at the address must always be confirmed with Lahti Energy. The price list applies only to addresses where Lahti Energy has confirmed that district heating is available.
The price includes 15 metres of connection pipe outside the building and 2 metres inside the building. Any metres exceeding these lengths will be charged according to the price list.
The length of the connection pipe outside the building is calculated from the district heating network connection point to the entry point of the building. The length of the connection pipe inside the building is calculated from the entry point to the metering device.
The connection fee includes excavation work for the connection route, the connection pipe material and connection work from the district heating network up to the metering centre, the wall penetration component, backfilling of the excavation with the removed or equivalent soil material, and rough levelling of the excavation within the plot area. The connection fee does not include final finishing work within the plot area, structural penetration work or installation of the wall penetration component. Lahti Energy is responsible for finishing work in areas outside the plot.
Lahti Energy reserves the right to offer a district heating connection at a higher connection fee than would be calculated according to the price list if the construction costs of the connection include something out of the ordinary.
The price list applies to one district heating connection for a detached house, semi-detached house or similar residential building. The price list does not apply to buildings with more than two dwellings.
1 255 EUR (VAT 25,5%) is added to the normal connection fee, and the resulting amount is divided equally into two connection fees.
The connection fee is determined using the formula on the price list.
Connections with a contracted water flow more than 25 m3/h are priced on a case-by-case basis.
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Connection fee, € | 4 593,30 + additional metres, alv. 25,5& | 3660 + additional metres |
| Additional metres, €/m | 188,25, alv. 25,5& | 150 |
| Contracted water flow, V | Connection fee, € | ALV 25,5% | ALV 0% |
|---|---|---|---|
| 0–0,5 | 6024 + additional metres, alv. 25,5% | 6024 + additional metres, alv. 25,5& | 4800 + additional metres |
| 0,6–1,5 | (4800 + (V – 0,5) x 2700) x 1,255 + additional metres, alv. 25,5% | (4800 + (V – 0,5) x 2700) x 1,255 + additional metres, alv. 25,5& | (4800 + (V – 0,5) x 2700) + additional metres |
| 1,6–9 | (7500 + (V – 1,5) x 400) x 1,255 + additional metres, alv. 25,5% | (7500 + (V – 1,5) x 400) x 1,255 + additional metres, alv. 25,5& | (7500 + (V – 1,5) x 400) + additional metres |
| 9,1–25 | (10500 + (V – 9) x 125) x 1,255 + additional metres, alv. 25,5% | (10500 + (V – 9) x 125) x 1,255 + additional metres, alv. 25,5& | (10500 + (V – 9) x 125) + additional metres |
| Contracted water flow, V | Additional metres outside, €/m | Additional metres inside, €/m | ALV 25,5% | ALV 0% |
|---|---|---|---|---|
| 0–0,5 | 225,90, alv. 25,5% | 188,25, alv. 25,5% | 188,25, alv. 25,5& | 150 |
| 0,6–1,5 | 276,10, alv. 25,5% | 188,25, alv. 25,5% | 188,25, alv. 25,5& | 150 |
| 1,6–9 | 301,20, alv. 25,5% | 238,45, alv. 25,5% | 238,45, alv. 25,5& | 190 |
| 9,1–25 | 338,85, alv. 25,5% | 282,38, alv. 25,5% | 282,38, alv. 25,5& | 225 |
See the price in the price list.
Request a quote from us.
For additional work agreed upon separately with the customer, the charge will be according to the quote provided or at an hourly rate as per the price list
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Inspection and expansion vessel maintenance | 109 €, alv. 25,5& | 86,85 € |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Inspection and expansion vessel maintenance | 209 €, alv. 25,5& | 166,53 € |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Inspection, 1 heat distribution centre | 189 €, alv. 25,5& | 150,60 € |
| Expansion vessel maintenance, 1 expansion vessel | 59 €, alv. 25,5& | 47,01 € |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Additional work agreed upon separately | 65 €/hour, alv. 25,5& | 54,98 €/hour |
Meter inspection in accordance with the terms of sale for district heating as per an external inspector’s offer.
MSCONS message service price list: *Includes e.g. power of attorney renewals, adding and terminating individual places of use and determining place of use numbers.
If your district heating payment is delayed, it will be transferred to our partner Ropo for processing. Ropo will charge service fees according to their price list. You will find contact information and details about the invoice on the bill sent by Ropo.
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Payment request and disconnection notice (VAT 0%) | 5 €, alv. 25,5& | 5 € |
| Reprinting an invoice | 5,06 €, alv. 25,5& | 4,03 € |
| Payment agreement fee | 10,12 €, alv. 25,5& | 8,06 € |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Disconnection fee | 60,73 €, alv. 25,5& | 48,39 € |
| Connection on the same working day (order placed before 1 pm) | 60,73 €, alv. 25,5& | 48,39 € |
| Express connection (connection on the same day, order placed after 1 pm) | 121,45 €, alv. 25,5& | 96,77 € |
| The first inspection is free of charge. Subsequent inspections: | ALV 25,5% | ALV 0% | |
|---|---|---|---|
| Other than detached houses | 506,05 €, alv. 25,5% | 506,05 €, alv. 25,5& | 403,23 € |
| Detached houses | 101,21 €, alv. 25,5% | 101,21 €, alv. 25,5& | 80,65 € |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Setting up delivery | 121,45 €/h (min 1 h), alv. 25,5& | 96,77 €/h (min 1 h) |
| Transmission of historical data | 121,45 €/h (min 1 h), alv. 25,5& | 96,77 €/h (min 1 h) |
| Place of use processing fee * | 121,45 €/h (min ½ h), alv. 25,5& | 96,77 €/h (min ½ h) |
| Termination of delivery | free of charge , alv. 25,5& | maksuton |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| 200 € | 200 €, alv. 25,5& | 159,36 € |
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Installer’s hourly rate | 65 €/h, alv. 25,5& | 51,79 €/h |
| Overtime | 100 €/h, alv. 25,5& | 79,68 €/h |
| Sunday or holiday work | 135 €/h, alv. 25,5& | 107,57 €/h |
| Surveys | 60,73 €/h, alv. 25,5& | 48,39 €/h |
| Advisory visit to the customer during working hours | 80,97 €/h, alv. 25,5& | 64,52 €/h |
District heating fees prices starting 1 January 2025 (consumers)
The district heating fees price list is the price list for consumer customers. The price list is selected based on the connection owner. The price list is not available for companies. However, this price list may also be selected by customers whose connection owner has a business ID, but the place of use has only one or two dwellings and no other space to be heated.
The total price of district heating consists of an energy fee, a fixed fee, a return water fee/compensation and taxes. The lowest possible laskutusteho for a detached house is 12 kW (9 kW in block heating).
Laskutusteho is billing power and laskutusvesivirta is billing water flow in English.
Fixed fee for district heating
The amount of the fixed fee depends on the laskutusteho (Ø) or laskutusvesivirta (V).
The fixed fee is determined according to the tariff as follows: Tariff 1 applies to sites with laskutusteho of up to 50 kW. Tariff 2 applies to sites with laskutusvesivirta of up to 4 m³/h. Sites larger than this are included in tariff 3.
As of 1 January 2025, the coefficient values are: k1= 3,95 k2= 4,45 k3= 4,45.
District heating return water fee/compensation as of 1 September 2020
The return water fee/compensation applies to places of use with laskutusvesivirta of 10 m3/h or more. The fee/compensation is a maximum of 5% of the sum of the fixed and energy fees for the billing period. The fee/compensation is invoiced only during the heating period (September–April). The target level of return water temperature is 43°C.
The return water fee/compensation, €/month (VAT 0%), is calculated as follows:
Tp = average return water temperature for the month, °C
E = energy consumption for the month, MWh
The value added tax valid at any given time is added to the return water fee/compensation.
| Price period | €/MWh | ALV 25,5% | ALV 0% | |
|---|---|---|---|---|
| 1 Nov–31 Mar | Winter period, alv. 25,5% | 99,02, alv. 25,5% | 99,02, alv. 25,5& | 78,90 |
| 1 Apr–31 May | Spring period, alv. 25,5% | 70,48, alv. 25,5% | 70,48, alv. 25,5& | 56,16 |
| 1 Jun–31 Aug | Summer period, alv. 25,5% | 39,35, alv. 25,5% | 39,35, alv. 25,5& | 31,36 |
| 1 Sep–31 Oct | Autumn period, alv. 25,5% | 70,48, alv. 25,5% | 70,48, alv. 25,5& | 56,16 |
| Rate | Fixed fee €/year | ALV 25,5% | ALV 0% |
|---|---|---|---|
| 1 | k1 x 13,96 x (Ø) x 1,255, alv. 25,5% | k1 x 13,96 x (Ø) x 1,255, alv. 25,5& | k1 x 13,96 x (Ø) |
| 2 | k2 x (91,66 + 859,44 x V) x 1,255, alv. 25,5% | k2 x (91,66 + 859,44 x V) x 1,255, alv. 25,5& | k2 x (91,66 + 859,44 x V) |
| 3 | k3 x (2204,10 + 331,33 x V) x 1,255, alv. 25,5% | k3 x (2204,10 + 331,33 x V) x 1,255, alv. 25,5& | k3 x (2204,10 + 331,33 x V) |
Teholämpö as of 1 January 2025 (companies, default price list)
Teholämpö is the default price list for places of use where the connection owner has a business ID. Teholämpö is not available for consumer customers. The price list can be changed every 12 months. The total price of district heating consists of an energy fee, a fixed fee and taxes.
Fixed fee
The fixed fee consists of two power fees: power fee 1 and power fee 2. The capacities for the power fees are determined based on hourly metering at the place of use. The district heating bill shows laskutusteho 1, which determines power fee 1, and laskutusteho 2, which determines power fee 2. Laskutusteho is billing power in English.
The review period is 1 April 2023–31 March 2025. If the heat consumption at the place of use has started later than 1 January 2024, both capacities correspond to the contracted capacity. (For new buildings, 60% of the contracted capacity.)
More about Teholämpö (in Finnish)
| Capacity at minimum, kW (Ø) | €/year | ALV 25,5% | ALV 0% |
|---|---|---|---|
| 0 | 685,13 x 1,255, alv. 25,5% | 685,13 x 1,255, alv. 25,5& | 685,13 |
| 20 | (-214,43 + 44,98 x Ø) x 1,255, alv. 25,5% | (-214,43 + 44,98 x Ø) x 1,255, alv. 25,5& | -214,43 + 44,98 x Ø |
| 50 | (308,57 + 34,52 x Ø) x 1,255, alv. 25,5% | (308,57 + 34,52 x Ø) x 1,255, alv. 25,5& | 308,57 + 34,52 x Ø |
| 100 | (831,57 + 29,29 x Ø) x 1,255, alv. 25,5% | (831,57 + 29,29 x Ø) x 1,255, alv. 25,5& | 831,57 + 29,29 x Ø |
| 300 | (6 009,27 + 12,03 x Ø) x 1,255, alv. 25,5% | (6 009,27 + 12,03 x Ø) x 1,255, alv. 25,5& | 6 009,27 + 12,03 x Ø |
| Capacity at minimum, kW (Ø) | €/vuosi | ALV 25,5% | ALV 0% |
|---|---|---|---|
| 0 | 685,13 x 1,255, alv. 25,5% | 685,13 x 1,255, alv. 25,5& | 685,13 |
| 20 | (-214,43 + 44,98 x Ø) x 1,255, alv. 25,5% | (-214,43 + 44,98 x Ø) x 1,255, alv. 25,5& | -214,43 + 44,98 x Ø |
| 50 | (308,57 + 34,52 x Ø) x 1,255, alv. 25,5% | (308,57 + 34,52 x Ø) x 1,255, alv. 25,5& | 308,57 + 34,52 x Ø |
| 100 | (831,57 + 29,29 x Ø) x 1,255, alv. 25,5% | (831,57 + 29,29 x Ø) x 1,255, alv. 25,5& | 831,57 + 29,29 x Ø |
| 300 | (6 009,27 + 12,03 x Ø) x 1,255, alv. 25,5% | (6 009,27 + 12,03 x Ø) x 1,255, alv. 25,5& | 6 009,27 + 12,03 x Ø |
| Price period | €/MWh | ALV 25,5% | ALV 0% | |
|---|---|---|---|---|
| 1 Nov–31 Mar | Winter period, alv. 25,5% | 98,73, alv. 25,5% | 98,73, alv. 25,5& | 78,67 |
| 1 Apr–31 May | Spring period, alv. 25,5% | 70,27, alv. 25,5% | 70,27, alv. 25,5& | 55,99 |
| 1 Jun–31 Aug | Summer period, alv. 25,5% | 39,24, alv. 25,5% | 39,24, alv. 25,5& | 31,27 |
| 1 Sep–31 Oct | Autumn period, alv. 25,5% | 70,27, alv. 25,5% | 70,27, alv. 25,5& | 55,99 |
Tasalämpö may be selected for places of use where the connection owner has a business ID. If the heat supply of the site is part of some other contract package, Tasalämpö cannot be selected for the place of use. The price list can be changed every 12 months.
The total price of district heating consists of an energy fee, a fixed fee and taxes.
Fixed fee
The fixed fee is power fee 1. The capacity for the power fee is determined based on hourly metering at the place of use. The district heating bill shows laskutusteho 1, which determines power fee 1. Laskutusteho is billing power in English.
The review period is 1 April 2023–31 March 2025. If the heat consumption at the place of use has started later than 1 January 2024, the capacity corresponds to the contracted capacity. (For new buildings, 60% of the contracted capacity.)
Inspection of district heating equipment is included in the price
Tasalämpö includes an inspection of the district heating equipment once every three years.
More about Tasalämpö (in Finnish)
| Capacity at minimum, kW (Ø) | €/year | ALV 25,5% | ALV 0% |
|---|---|---|---|
| 0 | 3435,78 x 1,255, alv. 25,5% | 3435,78 x 1,255, alv. 25,5& | 3 435,78 |
| 20 | (1 318,26 + 105,88 x Ø) x 1,255, alv. 25,5% | (1 318,26 + 105,88 x Ø) x 1,255, alv. 25,5& | 1 318,26 + 105,88 x Ø |
| 50 | (1 473,96 + 102,76 x Ø) x 1,255, alv. 25,5% | (1 473,96 + 102,76 x Ø) x 1,255, alv. 25,5& | 1 473,96 + 102,76 x Ø |
| 200 | (4 380,36 + 88,23 x Ø) x 1,255, alv. 25,5% | (4 380,36 + 88,23 x Ø) x 1,255, alv. 25,5& | 4 380,36 + 88,23 x Ø |
| 300 | (10 608,36 + 67,47 x Ø) x 1,255, alv. 25,5% | (10 608,36 + 67,47 x Ø) x 1,255, alv. 25,5& | 10 608,36 + 67,47 x Ø |
| Price period | €/MWh | ALV 25,5% | ALV 0% | |
|---|---|---|---|---|
| 1 Nov–31 Mar | Winter period, alv. 25,5% | 76,02, alv. 25,5% | 76,02, alv. 25,5& | 60,57 |
| 1 Apr–31 May | Spring period, alv. 25,5% | 54,10, alv. 25,5% | 54,10, alv. 25,5& | 43,11 |
| 1 Jun–31 Aug | Summer period, alv. 25,5% | 30,21, alv. 25,5% | 30,21, alv. 25,5& | 24,07 |
| 1 Sep–31 Oct | Autumn period, alv. 25,5% | 54,10, alv. 25,5% | 54,10, alv. 25,5& | 43,11 |
Rakentajan Lämpö is a price list for new buildings. Rakentajan Lämpö is valid only during the construction of the new building. When the final inspection of district heating has been carried out at the site, Rakentajan Lämpö ends and a default price list is selected for the place of use based on the owner of the connection.
The total price of the Rakentajan lämpö consists of the energy fee and taxes. There is no fixed fee.
Rakentajan Lämpö is verified with guarantees of origin. District heating verified with guarantees of origin is produced with renewable energy sources.
| ALV 25,5% | ALV 0% | |
|---|---|---|
| Rakentajan lämpö | 112,95 €/MWh, alv. 25,5& | 90,00 €/MWh |
We offer guarantees of origin as an additional service for district heating. District heating verified with guarantees of origin is produced with renewable energy sources.
More about guarantees of origin (in Finnish)
| ALV 25,5% | ALV 0% | |
|---|---|---|
| 1,00 € / MWh | 1,00 € / MWh, alv. 25,5& | 0,80 €/MWh |
If there is any conflict between the English and Finnish versions of these Terms of Contract, the Finnish version shall prevail.
If a dispute concerning a contract cannot be settled through negotiations between the parties, the consumer may bring the matter to the Consumer Disputes Board (in Finnish) for resolution.
The consumer must be in contact with the Consumer Advisory Service before bringing the matter before the Consumer Disputes Board.
If there is any conflict between the English and Finnish versions of these Terms of Contract, the Finnish version shall prevail.
If a dispute concerning a contract cannot be settled through negotiations between the parties, the consumer may bring the matter to the Consumer Disputes Board (in Finnish) for resolution.
The consumer must be in contact with the Consumer Advisory Service before bringing the matter before the Consumer Disputes Board.